How Long Will a Kitchen Remodeling Project Take? December 17, 2018

Brighton, Monroe
How Long Will a Kitchen Remodeling Project Take?, Brighton, New York

Kitchen remodeling is an exciting project. While the end result is well worth the expense, the entire process can take longer than many homeowners realize. That’s why it’s important to plan ahead and have a realistic time-frame for completion. Here is an overview of the kitchen remodeling process and how long each stage can take.

What You Should Know About the Kitchen Remodeling Timeline

Design

The design is the initial stage of a kitchen remodeling project and typically takes about one to two weeks. The homeowner will discuss their wants and needs with a designer during a consultation, and the professional will take measurements to create the design and layout for the new kitchen.

Ordering

Before demolition can begin, the contractor must order the materials, cabinetry, and fixtures from the manufacturer. Depending on the grade of the products, this process can take anywhere from three to 12 weeks. Stock items take about a month to come in, while custom products can take up to 12 weeks.

Demolition

Demolition takes a few days and should begin after all of the fixtures arrive to minimize kitchen downtime. This includes the removal of the flooring, cabinets, fixtures, and appliances. After the kitchen has been removed, the next step is to install the plumbing and electric systems, which can take an additional week.

Drywall & Flooring

kitchen remodelingFloor installation and painting is done before cabinetry installation. Painting the ceiling and walls will take a couple of days. The type of flooring you choose will also impact the timeline; hardwood and tile flooring can take up to a week, while vinyl flooring only takes a few days.

Cabinetry & Appliances

The last stage is to install the cabinetry, countertops, and appliances. Natural stone countertops must be fabricated, which can delay the final process by an additional two weeks. The final plumbing fixtures,  appliances, and if desired, tile backsplash are the last things installed, and the process could take up to a week.

 

When you’re ready to get started on your kitchen remodeling project, turn to the experts at Kornerstone Kitchens in Rochester, NY. With more than 40 years of experience in the industry, they design kitchens and other room additions for homeowners and businesses. One of their team members will work with you to create a space that best meets your lifestyle and budget, seeing you through the process from start to finish. Call (585) 427-0280 today to schedule an appointment or visit their website to view a full list of their products and services.

Other Announcements, Events and Deals from Kornerstone Kitchens
3 Functional & Stylish Tips for Home Office Remodeling, Brighton, New York
Your home office is a space that allows you to be productive while away from the hustle and noise of an office building. But just because it’s for work doesn’t mean it has to be dull...read more
5 Ways to Make the Most of a Small Kitchen Design, Brighton, New York
Even if your kitchen is on the small side, that doesn’t mean you can’t use the space to your advantage. There are several key tricks of the trade that can maximize the efficiency of ...read more
How to Pick the Right Countertops for Your Home, Brighton, New York
Picking out the ideal countertops for your home can be overwhelming given the wealth of options available on the market. What you choose will likely depend on several factors, such a...read more
4 Types of Sinks to Consider for a Kitchen Remodeling Project, Brighton, New York
Kitchen remodeling can significantly improve the aesthetics and functionality of your home. Along with cabinetry and countertops, the sink is one of the most vital parts of kitchen d...read more